Challenge OX had to haul 6 pieces, two of them weighing 8o tons each and 480cm wide, from Finland to Germany. Confined spaces were challenging [...]
Challenge OX Heavy was called in for the relocation of a 160to press from Germany to China. Disassemble, transport, and re-assemble was the scope of [...]
Challenge OX was ordered for their Factory to Foundation concept to haul and position a new turbine set from Germany to Denmark. The challenge was [...]
Challenge A press for an automotive client in North America was intended to be shipped but turned out to be high priority. The case 616 [...]
Challenge Heavy haulage and rigging a turbine package in Spain. Solution The turbine was transported by road from Germany to Spain. The generator and other [...]
Challenge Disassemble two presses in Europe, transport to the USA and reassemble them into the new factory. Solution In two weeks both presses were dismantled, [...]