Challenge OX had to haul 6 pieces, two of them weighing 8o tons each and 480cm wide, from Finland to Germany. Confined spaces were challenging [...]
Challenge OX Heavy was called in for the relocation of a 160to press from Germany to China. Disassemble, transport, and re-assemble was the scope of [...]
Challenge OX was ordered for their Factory to Foundation concept to haul and position a new turbine set from Germany to Denmark. The challenge was [...]